Files
pocket_assistant/documentation/project_plan.md
2025-03-31 20:47:59 +01:00

8.4 KiB

Pocket Assistant Project Plan

This document outlines the implementation plan for the Pocket Assistant application, divided into distinct phases based on the project outline. Each phase builds upon the previous one to create a comprehensive personal assistant application with modular extensions and AI integration.

Phase 1: Foundation and Core Architecture (Weeks 1-4)

Goals

  • Establish the core architecture and basic framework
  • Set up development environment and tooling
  • Implement the basic UI shell

Tasks

  1. Project Setup (Week 1)

    • Set up version control repository
    • Establish development environment (VS Code, Git)
    • Configure CI/CD pipelines (GitHub Actions)
    • Set up basic project documentation
  2. Core Architecture Implementation (Weeks 2-3)

    • Develop the core application framework
    • Implement the extension API foundation
    • Create the basic data layer with local SQLite storage
    • Establish the service layer for component communication
  3. Basic UI Implementation (Week 4)

    • Implement the web-based UI shell using React/Vue.js
    • Create responsive layouts for desktop platforms
    • Develop the extension container interface
    • Implement basic navigation and settings views

Deliverables

  • Functional application shell with extension loading capability
  • Basic settings management
  • Initial project documentation
  • CI/CD pipeline for automated testing and builds

Phase 2: Initial Extensions and Local Functionality (Weeks 5-10)

Goals

  • Implement the core extensions (Notes, Reminders, To-Do List)
  • Establish extension interoperability
  • Create user authentication for local use

Tasks

  1. Notes Extension (Weeks 5-6)

    • Implement rich text editor with markdown support
    • Create note organization system (folders, tags)
    • Develop search functionality
    • Add export capabilities (PDF, Markdown, HTML)
  2. Reminders Extension (Weeks 7-8)

    • Implement time-based reminder system
    • Create recurring reminder capabilities
    • Develop notification system
    • Design and implement calendar view
  3. To-Do List Extension (Weeks 9-10)

    • Implement task creation and management
    • Develop subtask functionality
    • Create progress tracking features
    • Implement filtering and organization options
    • Integrate with the Reminders extension

Deliverables

  • Fully functional Notes extension
  • Complete Reminders extension with notifications
  • Comprehensive To-Do List with subtask capability
  • Extension interoperability framework
  • User documentation for core extensions

Phase 3: AI Integration and Security (Weeks 11-16)

Goals

  • Implement AI integration (Claude and LM Studio)
  • Enhance application security
  • Develop the AI Chat extension

Tasks

  1. AI Integration Framework (Weeks 11-12)

    • Implement Claude API integration
    • Develop LM Studio local model support
    • Create AI provider abstraction layer
    • Implement API key management and security
  2. AI Chat Extension (Weeks 13-14)

    • Develop conversational interface
    • Implement context management
    • Create extension integration capabilities
    • Add command parsing for application control
  3. Security Implementation (Weeks 15-16)

    • Implement end-to-end encryption for sensitive data
    • Develop authentication system
    • Create permissions framework for extensions
    • Conduct initial security audit
    • Implement privacy controls for AI interactions

Deliverables

  • Functional AI Chat extension
  • Claude and LM Studio integration
  • Secure API key storage
  • Authentication system
  • Extension permissions framework
  • Privacy controls and documentation

Phase 4: Cross-Platform Compatibility and Testing (Weeks 17-22)

Goals

  • Ensure compatibility across Windows, macOS, and Linux
  • Implement comprehensive testing
  • Optimize performance

Tasks

  1. Cross-Platform Implementation (Weeks 17-18)

    • Test and optimize for Windows 10+ with native notification support
    • Implement macOS-specific adaptations and optimizations
    • Develop Linux support for major distributions
    • Create platform-specific installation packages
  2. Testing Implementation (Weeks 19-20)

    • Develop unit tests for core components
    • Implement integration tests for extensions
    • Create UI tests for the interface
    • Establish performance benchmarks
    • Conduct accessibility testing
  3. Performance Optimization (Weeks 21-22)

    • Profile application performance
    • Optimize data access and storage
    • Enhance UI responsiveness
    • Reduce resource usage
    • Implement application startup optimizations

Deliverables

  • Platform-specific packages for Windows, macOS, and Linux
  • Comprehensive test suite
  • Performance optimization report
  • Accessibility compliance documentation
  • Installation guides for each platform

Phase 5: Polish, Documentation, and Initial Release (Weeks 23-26)

Goals

  • Prepare the application for initial release
  • Complete user and developer documentation
  • Establish maintenance procedures

Tasks

  1. Final Polish (Week 23)

    • Conduct UI/UX review and refinement
    • Implement final visual design elements
    • Address any outstanding bugs or issues
    • Perform end-to-end testing
  2. Documentation Completion (Week 24)

    • Finalize user documentation
    • Complete developer documentation for the extension API
    • Create installation and upgrade guides
    • Develop troubleshooting resources
  3. Release Preparation (Weeks 25-26)

    • Establish release channels (alpha, beta, stable)
    • Implement the auto-update mechanism
    • Create the project website and documentation portal
    • Prepare marketing materials
    • Develop the user feedback system

Deliverables

  • Release-ready application
  • Complete documentation suite
  • Functional auto-update system
  • Project website and user portal
  • Feedback and issue reporting system

Phase 6: Future Development and Community Building (Post-Initial Release)

Goals

  • Implement additional extensions
  • Develop community engagement
  • Begin work on mobile support

Tasks

  1. Additional Extensions Development

    • Implement Calendar integration
    • Develop Email Client extension
    • Create Weather and News extensions
    • Implement Knowledge Base functionality
  2. Community Building

    • Establish extension marketplace infrastructure
    • Create developer resources and examples
    • Implement extension verification system
    • Build community forums and support resources
  3. Mobile Development Preparation

    • Design mobile UI/UX
    • Establish cross-platform data synchronization
    • Develop Android application prototype
    • Create iOS application prototype

Deliverables

  • Additional extensions
  • Extension marketplace
  • Active developer community
  • Mobile application prototypes
  • Cloud synchronization capabilities

Resource Allocation

Development Team

  • 2 Full-stack developers
  • 1 UI/UX designer
  • 1 QA engineer
  • 1 Technical writer (part-time)

Infrastructure

  • Source control: GitHub
  • CI/CD: GitHub Actions
  • Documentation: Markdown in repository
  • Communication: Slack and weekly sync meetings
  • Issue tracking: GitHub Issues

Risk Assessment and Mitigation

Risk Impact Likelihood Mitigation
Extension API changes High Medium Thorough design upfront, semantic versioning, migration tools
Performance issues with many extensions Medium Medium Performance testing early, resource usage limits
Security vulnerabilities High Medium Regular security audits, dependency scanning
AI integration complexity Medium High Abstraction layer, fallback mechanisms
Cross-platform compatibility issues Medium High Early testing on all platforms, platform-specific adaptations

Success Metrics

  • User retention: >70% after 30 days
  • Extension adoption: Average of 3+ extensions used per user
  • Performance: <2 second startup time on reference hardware
  • Stability: <1% crash rate
  • AI utilization: >50% of users actively using AI features

Conclusion

This project plan outlines a systematic approach to developing the Pocket Assistant application, from its foundational architecture to a full-featured personal assistant with AI capabilities and modular extensions. By following this phased approach, we can manage complexity, deliver incremental value, and adjust our priorities based on user feedback throughout the development process.