Files
pocket_assistant/documentation/project_plan.md
2025-04-01 23:42:02 +01:00

9.6 KiB

Pocket Assistant Project Plan

This document outlines the implementation plan for the Pocket Assistant application, divided into distinct phases based on the project outline. Each phase builds upon the previous one to create a comprehensive personal assistant application with modular extensions and AI integration.

Phase 1: Foundation and Core Architecture (Weeks 1-4)

Goals

  • Establish the core architecture and basic framework
  • Set up development environment and tooling
  • Implement the basic UI shell

Tasks

  1. Project Setup (Week 1)

    • Set up version control repository
    • Establish development environment (VS Code, Git)
    • Configure CI/CD pipelines (GitHub Actions)
    • Set up basic project documentation
  2. Core Architecture Implementation (Weeks 2-3)

    • Develop the core application framework
    • Implement the extension API foundation
    • Create the basic data layer with local SQLite storage
    • Establish the service layer for component communication
  3. Basic UI Implementation (Week 4)

    • Implement the web-based UI shell using React/Vue.js
    • Create responsive layouts for desktop platforms
    • Develop the extension container interface
    • Implement basic navigation and settings views

Deliverables

  • Functional application shell with extension loading capability
  • Basic settings management
  • Initial project documentation
  • CI/CD pipeline for automated testing and builds

Phase 2: AI Integration and AI Chat Extension (Weeks 5-10)

Goals

  • Implement AI integration (Claude and LM Studio)
  • Develop the AI Chat extension with personality selector
  • Establish AI security and privacy controls

Tasks

  1. AI Integration Framework (Weeks 5-6)

    • Implement Claude API integration
    • Develop LM Studio local model support
    • Create AI provider abstraction layer
    • Implement API key management and security
  2. AI Chat Extension Development (Weeks 7-8)

    • Develop conversational interface
    • Implement AI personality selector and customization
    • Create context management for conversations
    • Implement chat history and memory features
  3. AI Security and Integration (Weeks 9-10)

    • Implement end-to-end encryption for chat data
    • Create extension integration capabilities for AI
    • Add command parsing for application control
    • Develop privacy controls for AI interactions
    • Implement performance optimizations for chat experience

Deliverables

  • Fully functional AI Chat extension
  • AI personality selection and customization
  • Claude and LM Studio integration
  • Secure API key storage
  • Privacy controls and documentation

Phase 3: User Goal Planner Extension (Weeks 11-16)

Goals

  • Implement the User Goal Planner extension
  • Develop goal tracking and visualization
  • Create AI-assisted goal recommendations

Tasks

  1. Goal Planning Foundation (Weeks 11-12)

    • Implement goal creation and management system
    • Develop short/medium/long-term goal categorization
    • Create goal progress tracking features
    • Implement milestone management
  2. Goal Visualization and Analytics (Weeks 13-14)

    • Develop progress visualization tools
    • Create goal timeline and roadmap views
    • Implement analytics for goal achievement rates
    • Design notification system for goal updates
  3. AI-Enhanced Goal Planning (Weeks 15-16)

    • Integrate AI for goal recommendations
    • Implement smart actionable steps generation
    • Create adaptive goal adjustment based on progress
    • Develop goal prioritization algorithms
    • Integrate with AI Chat for conversational goal management

Deliverables

  • Comprehensive User Goal Planner extension
  • Goal visualization and progress tracking
  • AI-assisted goal recommendations
  • Integration with AI Chat extension
  • User documentation for goal planning features

Phase 4: Reminders & Calendar Extension (Weeks 17-22)

Goals

  • Implement Reminders & Calendar functionality
  • Develop integration with the Goal Planner
  • Establish comprehensive time management system

Tasks

  1. Reminders System Implementation (Weeks 17-18)

    • Develop time-based reminder system
    • Create recurring reminder capabilities
    • Implement notification system
    • Design priority levels and categorization features
  2. Calendar Interface Development (Weeks 19-20)

    • Create calendar view with different time scales
    • Implement event creation and management
    • Develop visual timeline for upcoming events
    • Design location-based alert system
  3. Goal Planner Integration (Weeks 21-22)

    • Implement unified interface with Goal Planner
    • Create synchronized view of goals and reminders
    • Develop AI suggestions for scheduling
    • Build smart time blocking features
    • Test and optimize the integrated experience

Deliverables

  • Complete Reminders & Calendar extension
  • Unified view with Goal Planner (optional)
  • Flexible notification system
  • Time visualization tools
  • Integration documentation and user guides

Phase 5: Core Productivity Suite and Testing (Weeks 23-28)

Goals

  • Implement remaining productivity extensions (Notes, To-Do List)
  • Ensure cross-platform compatibility
  • Conduct comprehensive testing

Tasks

  1. Notes Extension (Weeks 23-24)

    • Implement rich text editor with markdown support
    • Create note organization system (folders, tags)
    • Develop search functionality
    • Add export capabilities (PDF, Markdown, HTML)
  2. To-Do List Extension (Weeks 25-26)

    • Implement task creation and management
    • Develop subtask functionality
    • Create filtering and organization options
    • Integrate with other extensions
  3. Cross-Platform Testing (Weeks 27-28)

    • Test and optimize for Windows, macOS, and Linux
    • Implement platform-specific adaptations
    • Conduct performance testing
    • Perform accessibility testing
    • Create platform-specific installation packages

Deliverables

  • Notes extension with rich text support
  • To-Do List with subtask capability
  • Platform-specific packages
  • Comprehensive test reports
  • Performance optimization documentation

Phase 6: Polish, Documentation, and Initial Release (Weeks 29-32)

Goals

  • Prepare the application for initial release
  • Complete user and developer documentation
  • Establish maintenance procedures

Tasks

  1. Final Polish (Week 29)

    • Conduct UI/UX review and refinement
    • Implement final visual design elements
    • Address any outstanding bugs or issues
    • Perform end-to-end testing
  2. Documentation Completion (Week 30)

    • Finalize user documentation
    • Complete developer documentation for the extension API
    • Create installation and upgrade guides
    • Develop troubleshooting resources
  3. Release Preparation (Weeks 31-32)

    • Establish release channels (alpha, beta, stable)
    • Implement the auto-update mechanism
    • Create the project website and documentation portal
    • Prepare marketing materials
    • Develop the user feedback system

Deliverables

  • Release-ready application
  • Complete documentation suite
  • Functional auto-update system
  • Project website and user portal
  • Feedback and issue reporting system

Phase 7: Future Development and Community Building (Post-Initial Release)

Goals

  • Implement additional extensions
  • Develop community engagement
  • Begin work on mobile support

Tasks

  1. Additional Extensions Development

    • Implement Calendar integration
    • Develop Email Client extension
    • Create Weather and News extensions
    • Implement Knowledge Base functionality
  2. Community Building

    • Establish extension marketplace infrastructure
    • Create developer resources and examples
    • Implement extension verification system
    • Build community forums and support resources
  3. Mobile Development Preparation

    • Design mobile UI/UX
    • Establish cross-platform data synchronization
    • Develop Android application prototype
    • Create iOS application prototype

Deliverables

  • Additional extensions
  • Extension marketplace
  • Active developer community
  • Mobile application prototypes
  • Cloud synchronization capabilities

Resource Allocation

Development Team

  • 2 Full-stack developers
  • 1 UI/UX designer
  • 1 QA engineer
  • 1 Technical writer (part-time)

Infrastructure

  • Source control: GitHub
  • CI/CD: GitHub Actions
  • Documentation: Markdown in repository
  • Communication: Slack and weekly sync meetings
  • Issue tracking: GitHub Issues

Risk Assessment and Mitigation

Risk Impact Likelihood Mitigation
Extension API changes High Medium Thorough design upfront, semantic versioning, migration tools
Performance issues with many extensions Medium Medium Performance testing early, resource usage limits
Security vulnerabilities High Medium Regular security audits, dependency scanning
AI integration complexity Medium High Abstraction layer, fallback mechanisms
Cross-platform compatibility issues Medium High Early testing on all platforms, platform-specific adaptations

Success Metrics

  • User retention: >70% after 30 days
  • Extension adoption: Average of 3+ extensions used per user
  • Performance: <2 second startup time on reference hardware
  • Stability: <1% crash rate
  • AI utilization: >50% of users actively using AI features

Conclusion

This project plan outlines a systematic approach to developing the Pocket Assistant application, from its foundational architecture to a full-featured personal assistant with AI capabilities and modular extensions. By following this phased approach, we can manage complexity, deliver incremental value, and adjust our priorities based on user feedback throughout the development process.